Ez-access PATHWA MODULAR ACCESS SYSTEM Instrukcja Użytkownika Strona 20

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 49
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 19
- 20 -
3.6.
ANCHOR RAMP UPPER TRANSITION:
The MRUT (RAMP UPPER TRANSITION)
must be anchored to a substantial surface. Use the pre-drilled holes at each corner of the
upper transition as guides.
3.6.1.
IF RESTING ON A WOODEN SURFACE:
3.6.1.1.
Secure upper transition by installing the 1/4 self-drilling stainless
steel screw through each hole (FIG. 3.18).
3.6.2.
IF RESTING ON A CONCRETE SURFACE:
3.6.2.1.
Transfer the hole locations from the upper transition to the
concrete surface, then remove the upper transition.
3.6.2.2.
Using a 1/4 masonry bit, drill two 1-1/2 deep holes at the
marked locations.
NOTE:
After drilling, make sure that the holes
are free of any residue and/or debris.
3.6.2.3.
Re-attach the upper transition and align over the drilled holes.
3.6.2.4.
Drive the 1/4 diameter mushroom head pin anchors into the
holes on the upper transition with a hammer until the head is
seated.
FIG. 3.18
Przeglądanie stron 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 48 49

Komentarze do niniejszej Instrukcji

Brak uwag